Changzhutan Business District Landscape Lighting Project Phase I Tender Notice

The first phase of the bidding project for the Changsha-Zhuzhou-Zhutan commercial district landscape lighting project has been approved by the Tianxin District Development and Reform Bureau of Changsha City, Tianfa Reform [2016] No. 272, and the construction funds have come from the district finance. The bid inviting party (project owner) is the Changsha City Tianxin District Urban Management and Administrative Enforcement Bureau. The project has already met the conditions for tendering and the project is being tendered for construction.

2. Project overview and scope of tender
2.1 Project Name: Phase I of the Landscape Lighting Project of Changsha-Zhuzhou-Xiang Business Circle
2.2 Construction Site: The intersection of Furong South Road and Pangtang Road to Wanjiali Road
2.3 Construction scale: Landscape lighting of buildings and green belts along the intersection of Furong South Road from the intersection of Phitang Road to Wanjiali, with a scale of approximately RMB 10 million.
2.4 Project Cost: 10 million yuan
2.5 Duration Requirements: 20 calendar days
2.6 Quality Requirements: Comply with the National Acceptance Standards and Qualified Engineering Standards
2.7 Warranty Requirements: Warranty in accordance with Decree No. 279 of the State Council 2000
2.8 Scope of Bidding: The first phase of the landscape lighting project of the Mayor of the Zhuzhou-Zhutan Business District in Changsha. The details of the project will be based on the construction drawings and quantity list provided by the tenderer.

Bolier Pressure Gauge

Boiler Pressure Gauge,Inflatable Pump Pressure Gauge,Mini-Sized Theromanometer Pressure Gauge,Gauge Pressure

ZHOUSHAN JIAERLING METER CO.,LTD , https://www.zsjrlmeter.com

Posted on