LED Panel Light Installation
Tabel two-side glue on power
1. Play this power backward (figure 1)
2. After the Power play backwards, post 3M glue above the power supply (figure 2)
Note: 3m plastic with a strong viscosity, pls carefully paste
3. 3M Glue paste on the power, squash with the hand, make 3M glue tight stick on the power supply (FIG. 3)
4. Rip off 3 M Gule surface tape (figure 6)
5. Tear Tape (FIG. 5)
The power pack on Led Panel Light back
1. Pls make the power labeled 3M glue side paste on the Led Panel Light (figure 6.7)
Note:
a. Pls put a soft mat on the floor before Installing the power supply , lest scratches or damaged panel
b. The Power fixed position and direction are not limited
c. In order to ensure products shine achieve the best effect, Please carefully take and put when place the panel lamp .
2. Make the power output terminal link to the Led Panel Light input (FIG 8)
a. Please note the power wiring of positive and negative when installation power wiring
(positive with word)
b. Connect into the Led Panel Light terminals power wire needs to tighten with the screwc. To avoid danger, pls cut off power supply before connecting wiring.
d. Lock the screw, pls not use greatly forcibly, lest crush the Led Panel Light
3. Make the power input terminal received AC power supply (FIG 9)
Warning:
a. Please note that power wires' negative source, when installationb. Handle properly insulation in joint local, prevent leakage and emerge risk
c. Wiring must cut off power supply,prevent occur the danger
Embedded installation of Led Panel Light.
1. Make the Led Panel Light placed above the ceiling
Note:
a. Taken the ceiling and Led Panel Light turn 45 degrees, and put it above the ceiling , pls do not force squeezing or through the ceiling
b. please placed Led Panel Light handled with care, ensure the products shine with the best effect
c. Choose embedded installation Led Panel Light, first consideration that wether the Led Panel Light and the size of the ceiling corresponds
2. Make rotating face of the Led Panel Light down (FIG.12.13)
3.Make the Led Panel Light and the ceiling lanterns position adjustment aligned, that is to say, completed the installation process (FIG.14)
4.You can open power and lighting, when the Led Panel Light completed installation (figure 15)
Important:
a. Pls checking and ensuring all joints is right connected after completed the installation
b. Check and ensure all positive and negative of the joints power is correct
c. Check all lock screw parts whether fixed lock
Suspension installation of Led Panel Light
1. Make the corner fixing parts installed above Led Panel Light (FIG.16.17)
Note:
a. Pls put a soft mat on the floor before Installing corner fixing parts , lest scratches or damaged panel
b. Please placed panel lamp handled with care, ensure the products shine with the best effect
c. Lock the screw, pls not use greatly forcibly, lest crush the Led Panel Light
2. Make the corner fixing parts installation the ceiling top (FIG.19.20.21)a. The first open four φ5mm holes on the ceiling
b. Make the glue plug put into open good holes
c. Screw through fixed cap, locked in plug hole
4. Power input connected with AC power supply (FIG.22)
5. Led Panel Light installation completed effect -open power and lighting (FIG. 23)Important:
a: Pls checking and ensuring all joints is right connected after completed the installation
b: Check and ensure all positive and negative of the joints power is correct
c: Check all lock screw parts whether fixed lock
GL is a integration R&D design and production in the LED Panel Lamp field Led Panel Light Chinese manufacturer, production and packaging large enterprises, the company's products can satisfy ever-changing the world market illume requirement. Provide product series include various can directly replace incandescent lamps and lanterns LED light, high brightness, various emitting light colors for optional, welcome your inquiries
Many other LED Panel Light for available.